Incident INC-000000693 • Created 2025-06-23 11:42 UTC
Customer Ethernet Virtual Circuit (EVC) experienced pseudowire session drop between SYD and BNE endpoints, causing Layer 2 connectivity loss.
LDP session timeout due to control plane congestion during peak traffic hours. Pseudowire signaling packets were delayed beyond keepalive threshold.
Verify pseudowire status and LDP session state
Assigned to: Lisa Wong
Completed: 2025-06-23 11:50 UTC
Analyze control plane traffic and congestion metrics
Assigned to: Lisa Wong
Completed: 2025-06-23 12:05 UTC
Adjust LDP keepalive timers and priority queuing
Assigned to: Lisa Wong
Completed: 2025-06-23 12:20 UTC
Re-establish pseudowire and verify EVC connectivity
Assigned to: Lisa Wong
Completed: 2025-06-23 12:30 UTC